Al Joud
Starts from 25,000 OMR
- Ownership Type GCC Nationals Only
- Delivery Date7/1/2028
- Total Area— sqm
- Project Status Under Construction
Project Completion Rate 47%
About Project
Al Joud Project — Al Ansab is a residential and commercial project in Al Ansab, consisting of a ground floor with six shops and a gym, followed by residential floors, with six apartments on each floor, served by two elevators. Located in Al Ansab near the service road and the expressway, the project is situated close to the service road, banks, and markets, and connects to the expressway in minutes. The project is approximately: 1 minute from the service road. 3 minutes from Bank Muscat. 4 minutes from Lulu Market Al Ansab. 6 minutes from the expressway. Apartments with 1 and 2 bedrooms and shops starting from 60 square meters with one bedroom and two bathrooms, then 61 square meters with the same layout, then 93 square meters with two bedrooms and three bathrooms, reaching up to 94 square meters. The shops on the ground floor range in size from 29 square meters up to 99 square meters. Smart entry for buildings and apartments. The project features a gym on the ground floor, six commercial shops, a surveillance system, and two elevators. Expected delivery date: July 2028.
Choose your layout
10 layouts 19 available units29 sq m Commercial Shop
25,000OMR View unitsAl Awsaq Commercial Shop
99 sqm View unitsArea and price can vary between units of the same layout by floor and view.
Amenities
Project Details
Payment Plans
Commercial shop with a practical space for business activities measuring 29 square meters in Al Ansab
- Price
- 25,000OMR
- Area
- 29 sqm
- Floor
- Ground floor
About this unit
Commercial shop on the ground floor of the Al Jood project in Al Ansab. Al Jood project is in the heart of Al Ansab, close to daily services and main axes. The unit area is 29 square meters with an independent facade and entrance, and its location is number 4 in the row of commercial units in the project. The shop is on the ground floor of a residential building comprising six apartments on each floor and a gym, with handover in July 2028. Installments over 24 months.
