Al Masار Al Wahid Logo
English

Our Real Estate Projects

Explore our collection of residential and commercial projects across various cities in the Sultanate, and filter them to suit your needs.

Under Construction

Dar Al Qurum

Ras Al Hamra

Dar Al Qurum project — Ras Al Hamra, Qurum. A residential project located on the highest peak in Ras Al Hamra, Qurum. It consists of a basement floor, a mezzanine floor, and six residential floors, with fifteen apartments on each floor, totaling ninety apartments, built on a land area of 2,210 square meters with a built-up area of 15,591.5 square meters, featuring ninety parking spaces. An elevated location close to the heart of the capital, the project overlooks Qurum from the heights of Ras Al Hamra, surrounded by mosques, parks, schools, hospitals, and local markets, with access to the expressway in minutes. The project is approximately: 2 minutes from Saih Al Malih Mosque. 5 minutes from Qurum Natural Park and the PDO Planetarium. 8 minutes from Khoula Hospital and PDO School. 10 minutes from Muscat Expressway. 13 minutes from City Centre Qurum. 30 minutes from Muscat International Airport. Apartments in two models with tiered areas starting from 77 square meters featuring one bedroom and two bathrooms, then 82.75 square meters with the same layout, while three-bedroom and four-bathroom apartments range from 113.6 to 129.75 square meters, reaching up to 140 square meters. A penthouse is available with an area of 82.75 square meters featuring one bedroom and two bathrooms, and another penthouse with an area of 114.15 square meters featuring three bedrooms and four bathrooms. Finishes with international brands including Al Rajhi concrete and Oman Cement, 4 mm thick waterproofing, JOTUN paints, Guardian double glazing, Shams, Al Maha, and Al Hind tiles along with Indian granite and Omani marble, GROHE sanitary ware and mixers, Hotex water heaters, LG inverter air conditioning and KDK fans, OTIS elevators, Hik Vision cameras and access control systems, and fire alarm and suppression systems from Naffco, Bristol, and Al Amana. The project includes a swimming pool, a gym, a children's playroom, an events hall, ninety parking spaces, and a surveillance system. Expected handover date: April 2028.

Delivery 2028
Progress 55%
Starts From 40,000 OMR
View Details
Under Construction

Dar Nada

Al Saadah

Dar Al Nada Project — Salalah, Al Saadah district, Sultan Taimur Street. A residential, commercial, and administrative project located on Sultan Taimur Street in the Al Saadah district of Salalah. It consists of a commercial ground floor with five shops, a mezzanine floor with six offices and a gym covering an area of 75 square meters, followed by five residential floors, totaling fifty apartments, served by two elevators. It is built on a plot of land measuring 903 square meters with a built-up area of 5,487 square meters, featuring twenty-nine indoor parking spaces and outdoor parking. A location close to mosques, malls, and the university, the project is situated near Al Rahman Mosque, Salalah Grand Mall, and the British School, with Dhofar University and Salalah Airport reachable within minutes. The project is approximately: 1 minute away from Al Rahman Mosque. 2 minutes away from Millennium Resort Salalah. 4 minutes away from Salalah Grand Mall. 6 minutes away from the British School. 8 minutes away from Nesto. 12 minutes away from Dhofar University and Sultan Qaboos Mosque. 18 minutes away from Salalah Airport. Three residential designs, offices, and shops. Units start from a studio with an area of 40.5 square meters and one bathroom, followed by a studio with an area of 41.4 square meters, then apartments with one bedroom and two bathrooms with areas of 66.5, 75, and 76 square meters, and apartments reaching 114 and 115 square meters featuring two bedrooms and three bathrooms. Shops have areas starting from 27 square meters up to 32.6 square meters, and offices range from 57 to 161.8 square meters. Finishes with international brands including Oman Cables and Oman Copper wires, Guardian double glazing, 4 mm thick waterproofing, GROHE sanitary ware and mixers, Hotex water heaters, LG air conditioning, OTIS elevators, JOTUN paints, Shams, Al Maha, and Al Hind tiles along with Indian granite and Omani marble, modern kitchens with contemporary fittings, INV, Dahua, and Hikvision cameras with a secure entry system, and fire alarm and suppression systems from Naffco, Bristol, and Al Aman. The project includes a gym, shops, offices, indoor and outdoor parking, and a surveillance system. Expected handover date: October 2028.

Delivery 2028
Progress 40%
Starts From 17,000 OMR
View Details

Page 2 of 2

Contact via WhatsApp
Reem Your Real Estate Consultant